Advanced Medical Center

Advanced Medical Center

locationPittsburgh, PA
metr
900,000sq. ft.
Layout Drawings
Modeling & Coordination
Shop Drawings

Scope of Work

Project Goals

While working on this project, we carried out a significant scope of work that included:

Electrical Systems: Electrical Equipment, Electrical Power System, Electrical Lighting System, Site Lighting, Grounding System
Special Systems:
Prefabrication:
Design & Coordination: Coordination with other trades
Specific Tasks:
Electrical Systems
Special Systems
Prefabrication
Design & Coordination
Specific Tasks

Challenges and Solutions

background
Technical
Requirements
Organizational

CHALLENGE

The building’s architectural complexity — with curved walls and no right angles — created significant feeder coordination challenges. Routing was further complicated by a congested main electrical room, where limited space had to be shared with dense equipment and competing MEP systems. As a 17-story hospital, the building had very narrow risers, making vertical conduit placement challenging and requiring creative space management and precise planning.

SOLUTIONS WE PROVIDED

  • Developed routing strategies adapted to curved walls and non-standard angles.
  • Optimized space usage in the main electrical room to accommodate equipment and MEP systems.
  • Planned vertical conduit runs to fit narrow risers through creative space allocation and detailed coordination.
Project Goals

Project Goals

Goal was to complete the full set of modeling and drawings examples in short tems based on the desig, that very massively changed 3 times over the project.

Proven Advantages

Proven AdvantagesProven Advantages

Innovative Solutions

Established a coordination platform in Revizto and applied unconventional constructability solutions that enabled routing a significant number of systems within limited space.

Process Optimization

Utilized modular solutions, pre-modeling strategies, and planning to streamline design and installation.

Clear Alignment

Followed the BIM Execution Plan, conducted regular coordination meetings, and maintained consistent communication across teams.

Quality Assurance

Performed clash detection to deliver a clash-free model and ensured full compliance with project standards.

Results and Achievements

Archiving as detailed BIM model of electrical systems as posible to ensure proper planning and coordination to minimize rework

Results

Results

Successfully delivered the full scope on time with a well-coordinated BIM model, ensuring efficiency and constructibility.

Specific Results

Specific Results

On-time delivery with optimized costs and improved pathway routing efficiency, ensuring smoother installation and reduced rework.

Impact on the Team

Impact on the Team

By overcoming complex architecture, strict healthcare standards, and heavy trade coordination, the team sharpened space management and planning skills, strengthened cross-discipline communication, and improved its ability to adapt under pressure.

Results

Results

Successfully delivered the full scope on time with a well-coordinated BIM model, ensuring efficiency and constructibility.

Specific Results

Specific Results

On-time delivery with optimized costs and improved pathway routing efficiency, ensuring smoother installation and reduced rework.

Impact on the Team

Impact on the Team

By overcoming complex architecture, strict healthcare standards, and heavy trade coordination, the team sharpened space management and planning skills, strengthened cross-discipline communication, and improved its ability to adapt under pressure.