Layout &
Conduit Schedule

Layout & Conduit Schedule

Layout Drawings (or Redlines) are Bluebeam markups which are used for quick drawings analysis and planning the approximate route for modeling

During this process we ensure that we have enough information at design drawings for building 3D model, clarify requirements on the project and prepare for further modeling process

Service Insights

Basic pathway planning
BoM
Issues Analysis

During this process we ensure that we have enough information on the design drawings for modeling. We clarify requirements on the project and establish project standards.

  • Initial identification of no-fly zones
  • Planning initial circuit distribution for homeruns and branch
  • Early-stage issue detection
  • Approximate BOM for conduits
Basic pathway planning
Basic pathway planning
Layout &
Conduit Schedule

BIM Tools Applied in This Service

BluebeamBluebeam
Microsoft ExcelMicrosoft Excel

Get a Quote

0 / 500
logo

Address:

4549 W Dickman Rd, Springfield, MI 49037

© 2025 SJS Electric VDC Inc. All rights reserved.